FEATURE PROJECT:
GTA ALUPANG CABLE LANDING STATION & DATA CENTER

DESIGN HIGHLIGHTS:

Structural Engineering

  • Development of ETAB structural model to verify structural design

Civil  Engineering:

  • Site utility design

  • Erosion control and drainage
  • Paving

 

Mechanical, Electrical & Plumbing:

  • On-site 13.8kV primary distribution with two
    34.5/13.8kV - 480 2.5 MVA dual wound primary transformers

  • Two 2,500 kW generators

  • Two 480VAC 3600A switchboards

  • Redundant 380VDC and 48VDC distribution systems totaling 1.8MW of installed capacity

  • Power and lighting

  • 24,000 gal on-site diesel fuel storage

  • 988 tons of HVAC equipment

  • Plumbing with typical sanitary sewer and potable water system with on-site storage

GTA 2.jpg

SERVICES:

A/E Design - Architectural, Structural, Civil, Electrical & Mechanical

Construction Administration

Amorient Engineering developed construction documents for a Cable Landing Station and Data Center (Phase 1) with N+1  power and HVAC systems for critical IT load. The 40,000 SF data center is a two-story reinforced concrete building. Amorient Engineering worked with data center experts and the owner in developing a final design meeting the unique requirements of this multi-function facility.