top of page
Drone image of F1 Pier

FEATURE PROJECT:
F1 DOCK CONDITION ASSESSMENT

SERVICES:

Engineering Assessment

​

Amorient was appointed by Tristar Terminals Guam Inc. to conduct a substructure inspection and to provide recommendations for rehabilitation, repair or replacement of the damaged substructure elements.

​

The inspections included the main platform, four breasting dolphins and two mooring dolphins. The underwater inspections were performed by Hawaii based firm, Sea Engineering Inc.

bottom of page